Sort by

Black Forest Industries

BFI MK3 VR6 Cooling Kit

£174.00
  Recondition the cooling system in your VR6 with this coolant kit. Not only do these kits work great as a repair, but also as preventative maintenance against potential leaks in the future.  INCLUDES: Sensor o-rings (3) Thermostat with...

Black Forest Industries

BFI MK4 VR6 12V Cooling Kit

£250.00
  Recondition the cooling system in your VR6 with this coolant kit. Not only do these kits work great as a repair, but also as preventative maintenance against potential leaks in the future.  INCLUDES OE replacement thermostat...

Black Forest Industries

BFI Stage 1 PEM - MK3 / B4 2.8l VR6 OBDII

£165.00
***Please note that not all import parts are guaranteed to be in stock, do enquire with sales team prior to order if this is urgent. Otherwise we will assume a lead time is suitable of 7-10 days.  The BFI OBD-II VR6 PEM is designed to not...

Black Forest Industries

BFI Stage 2 PEM - MK3 / B4 2.8l VR6 OBDII (Cam Specific)

£165.00
***Please note that not all import parts are guaranteed to be in stock, do enquire with sales team prior to order if this is urgent. Otherwise we will assume a lead time is suitable of 7-10 days.  The BFI OBD-II VR6 PEM is designed to not...

PWRHAUS x BFI

PWRHAUS 1.8T CoilPack Adaptors (Set of 4)

£99.00
***Please note that not all import parts are guaranteed to be in stock, do enquire with sales team prior to order if this is urgent. Otherwise we will assume a lead time is suitable of 7-10 days.  These PWRHAUS Coil Pack Adapters are...

PWRHAUS x BFI

PWRHAUS 2.7T CoilPack Adaptors (Set of 6)

£136.00
***Please note that not all import parts are guaranteed to be in stock, do enquire with sales team prior to order if this is urgent. Otherwise we will assume a lead time is suitable of 7-10 days.  These Coil Pack Adapters are designed to...

PWRHAUS x BFI

PWRHAUS AAA VR6 SAI Plug

£45.00
***Please note that not all import parts are guaranteed to be in stock, do enquire with sales team prior to order if this is urgent. Otherwise we will assume a lead time is suitable of 7-10 days.  Put your SAI to "rest" with the Pwrhaus...
Add to Basket
Add to Basket